        Crossrail Reaches The Half Way Point In Its Construction | Human Impact on the Physical Environment | Geography

        LONDON, ENGLAND - FEBRUARY 21: A works locomotive makes its way down a tunnel in the Crossrail network near Canning Town on February 21, 2014 in London, England. The construction of the station, which began in May 2009 and is costing 500 million GBP, features four storeys of retail space above the ticket hall and platform levels and has currently reached the halfway point.